Product Description
Emulsified asphalt spraying tank
This equipment installs the asphalt tank, spraying mechanism, heating system, control system, power unit, etc. all on one chassis. During operation, it is hoisted onto an ordinary freight vehicle, and then the spraying operation can be carried out. There is no need for on - site installation and debugging, and it does not rely on the vehicle's power. The nozzle has good atomization, high spraying quality, and does not drip oil. It can complete the spraying of asphalt with a dosage of 0.4 - 1.2 kg per square meter.
|
Dimension(L*W*H)
|
Customize
|
|
Video outgoing-inspection
|
Provided
|
|
Brand Name
|
Chengshuo
|
|
Unique selling point
|
Energy saving
|
High efficiency heat transfer element - superconducting heat pipe heats asphalt and rapidly heats up.
Integrated with asphalt storage, heating, tarpaulin, and transportation.
Asphalt pumps, valves, and pipelines are automatically heated and insulated.
High pressure air blowing and no residual asphalt in the pipeline.
Warm box clearing function.
Multiple specifications of 1-10T (or customized according to user requirements).
There are three main types: trailer type, self-propelled type, and hoisting type.
The equipment is divided into two categories: the use of cold wine with emulsified green and the use of
The dual-use type of hot asphalt (also known as spray emulsified asphalt), the capacity of the asphalt tank and the spraying width are determined by the user.
Company Profile

Packaging & Shipping

FAQ

Q1. Can l get samples?
Yes.
Q2. Can l use my own logo or design on the products?
Yes, we offer OEM/ODM services; your logo and design can be made on the products.
Q3. Do you have a factory?
Yes, we have a factoryin Shandong. Welcome to visit our company and factory.
04. What is the production capacity of your factory?
Our production capacityis 200 sets of asphalt heating equipment per year.
Q5. when will the goods be shipped?
We will ship the goods within 30 days. lf the products are in stock, they will be shipped within 5 days.